Projects


16 MW Co-Gen-Power Plant with Biomass fired Fluidized Bed at Malsch

Design and construction of a 16 t/h FBC boiler plant for co-generating process steam and up to 3,4 MW electric power.
As fuel preferably renewable biomass from local production is used.


Click here for a more detailed description of the project

Pilot Plant for thermal use of rejects from breweries by Fermentation, Drying, Pyrolysis and Combustion

The Pilot Plant has been installed at a production site of the Fa. Ziemann + Bauer GmbH company in Kleinheubach/Bavaria for a limited period of 2 years and will completely be removed once the tests planned will have been executed. The individual components have been designed and built to be mobile so that they can be relocated and put into operation later at any other suitable location.


Click here for a more detailed description of the project

EU-funded Project SEDIS

The proprietary ETVS-Process has been developed to utilize liquid rejects such as sewage sludge or to use pastry or solid biological waste in small scale local facilities for steam and power generation. Simultaneously formed mineral ash is to be locally used, as to be demonstrated with biological rejects such as sewage sludge.


Click here for a more detailed description of the project



Projects

www.biomassekraftwerk-malsch.de
Pilot Plant Kleinheubach